Back to previous page Thames Water AMP 4  -  Sample Projects

Work TypeCivil Engineering
SectorWater
StatusIn Progresss
LocationVarious
ClientThames Water Utilities Ltd
EngineerThames Water Utilities Ltd
Contract Period6 years


A six year (2004—2010) framework agreement with Thames Water for AMP 4 works.

 
Beacon Hill Reservoir

A selection of contracts completed thus far include;

Seal Branch Sewer 
This contract involved laying 2.6km of 300mm diameter pumped sewer.

Whilst breaking out the redundant pipeline Dean & Dyball used Trackway, a heavy duty metal temporary roadway. This was environmentally friendly, re-useable and highly acceptable to the land owners.

Hawridge Water Main 
Work involved the construction of approximately 2.5km of 450mm diameter water main.

Ladywell Mains Diversion 
This 40 week contract was for the diversion of pipework on a restricted site in Lewisham.